This paper instructs the test equipment working principle of the unified power flow controller (UPFC), determines the datum should be sampled for the controlling and recording. Designs the hardware plate-form for the controller equipment. The plate-form is composed by controlling unit, supervising unit and recording unit. The test results, which based on the designed plat-form demonstrate, the implemented equipment can correspond to the power system variations smoothly and efficiently.